Aggregate Ratios and Material Requirements: What Is Used in Paver and Block Production?

Date :
Aggregate Ratios and Material Requirements: What Is Used in Paver and Block Production?

Aggregate Ratios and Material Requirements: What Is Used in Paver and Block Production?

The materials used in the production of paver and briquette blocks are closely related to the machine capacities. Our customers often ask about how much material they need to use daily based on our machine's production capacity. In this blog post, we will cover the aggregate (sand, cement, water) ratios and provide insights into the amount of raw materials needed according to the daily production capacity of our machines.
 
Materials Used in Paver and Block Production
 
The main materials used in the production of pavers, blocks, and curbstones include:
 
Sand: The primary component for durability.
Cement: A binder that ensures the hardness and durability of the products.
Water: Initiates chemical reactions and provides consistency to the mix.
 
Average Material Ratios
 
In general, the following ratios can be used for production:
 
Sand: 60-70%
Cement: 10-15%
Water: 15-20%
 
These ratios may vary depending on the type of product and desired quality, but they are common in paver and briquette production.
 
Daily Production Capacities of Our Machines and Material Requirements
 
Our machines offer a wide range of production capacities. Based on these capacities, the required amount of materials is estimated as follows:
 
Highest Capacity Machine:
Paver Production: For producing 45,000 pavers per day, approximately 100-120 tons of sand, 12-15 tons of cement, and 15-18 tons of water are required.
Block Production (20x40x20 cm): For producing 18,000-20,000 blocks daily, about 40-50 tons of sand, 5-7 tons of cement, and 5-7 tons of water are needed.
 
Lowest Capacity Machine:
Paver Production: For producing 10,000-12,000 pavers per day, approximately 25-30 tons of sand, 3-4 tons of cement, and 3-4 tons of water are required.
Block Production (20x40x20 cm): For producing 3,000-5,000 blocks daily, about 8-12 tons of sand, 1-2 tons of cement, and 1-2 tons of water are needed.
 
Calculating Material Requirements
To better understand how much raw material will be needed daily based on the machines you use, the information above provides a good guide. You can explore our website for more detailed information on the production capacities of each machine and select the one that best suits your needs.
 